skip to main
|
skip to sidebar
Sunday, September 14, 2008
Q: Can we add a bridge across Canal Street between Adams and Jackson, provided that the current traffic flow remains?
Any solution that allows for the continuity of traffic on Canal Street is permitted.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
SUBMIT A QUESTION
Please visit the Club at:
www.chicagoarchitecturalclub.org
Blog Archive
▼
2008
(53)
►
October
(1)
▼
September
(34)
Question and Answer Period Closed
Q: Is it possible to get any more context (height ...
Q: The West Loop Transportation Center includes an...
Q: As the commuter waiting area is accessible by t...
REMINDER: Question and Answer Deadline 15 September
UPDATED DRAWINGS AVAILABLE
Q: Can you provide more details about the construc...
Q: Can we add a bridge across Canal Street between...
Q: What are the requirements for the “secure waiti...
Q: Is "Clinton Street Transitway" (under Transport...
Q: What is the nature/use of the secure waiting ar...
Q: Will the pdf's(2@24"x36") be printed after they...
Q: Can different offices of the same corporate ent...
Q: Can participants submit more than one entry? Or...
Q: Can the secure waiting area be considered as th...
Q: Are all spaces inside the old Union Station ava...
Q: Can we change the elevation of Canal Street?
Q: Can we change the elevation of the tracks?
Q: How are the first tracks on the far west side a...
Q: Can the new track platform arrangement be redes...
REMINDER: Q&A Period Closes Sept 15, 2008.
Q: If 3 tracks are to be used for commuter rail, s...
Q: Can we change the outside and internal shape of...
Q: Would this ideas competition replace the mixed-...
NEW DRAWINGS AVAILABLE: Upper Level Plans
Q: Can I use metric measures instead of imperial m...
Q: There is an adjacent lot with a parking structu...
Q: Can you confirm the dimensions of the column gr...
Q: North and south of the concourse there are buil...
Q: Are drawings available for the level underneath...
Q: Can you provide more detailed plans (concourse,...
Q: Just to confirm, the entire SF of the Union Sta...
Q: Why aren't office and residetial functions incl...
Q: Which parts of the existing building should be ...
►
August
(17)
►
July
(1)
No comments:
Post a Comment